Client results

The Howard Centre

The Howard Centre case study: The Howard Centre is a multi-tenant retail destination adjacent to Welwyn Garden City railway station. Savills, as managing agent, needed a current…

All case studies

Case study

Welwyn Garden City, Hertfordshire

Sector

Commercial retail / shopping centre

Client

Savills (managing agent)

Scope

Full external envelope: roof, facades, canopies, walkways

Capture method

UAV visual inspection

237

Waypoints captured

<2hrs

Total time on site

Full envelope

Coverage achieved

The brief

The Howard Centre is a multi-tenant retail destination adjacent to Welwyn Garden City railway station. Savills, as managing agent, needed a current condition assessment of the external building envelope to inform planned maintenance and support the service charge budget.

The evidence

Ovrsite captured 237 waypoints across the full external envelope in a single visit lasting under two hours. The inspection was completed while the centre traded normally. Zero scaffolding, zero tenant disruption, zero closures. Network Rail airspace approval was obtained in advance by Ovrsite's operations team.

Decision enabled

A defensible service-charge budget submission and forward maintenance programme, backed by a full-envelope baseline.

The challenge

Sections of the building had never been properly inspected because of access limitations. Traditional methods would have meant scaffolding across a live retail centre, disruption to tenants and shoppers, and weeks of site presence. The centre also sits within Network Rail controlled airspace, adding a coordination layer that traditional approaches would not resolve.

What Ovrsite delivered

AI-assisted analysis produced a complete, graded condition record of the building envelope, including areas that had never been formally inspected. Every finding was geolocated, photographed, and prioritised, giving Savills an evidence base they had never previously had for this property.

The result

Savills received a full building envelope condition record covering areas that were previously invisible to their maintenance planning. The data gave the managing agent a defensible, evidence-led basis for the service charge budget submission and forward maintenance programme.

The same data now sits in Ovrsite Enterprise as a dated, auditable baseline, ready for comparison when the next inspection cycle runs. What would have taken weeks with scaffolding was completed in a single morning.

Working through a similar portfolio problem?

We can scope one qualifying building first.

Request your free inspection

“It gave a great insight and fantastic detail of areas that had not been visible for us to see.”

See it on your estate.

The fastest way to understand what building intelligence does for your portfolio is to see it on one of your own buildings. We can discuss a scoped pilot.

Pilot scope and terms

Own a portfolio of 10 or more buildings? We will inspect one of your buildings for free. We will agree the building, inspection scope and site arrangements with you before the visit.